Skip to content

Executed Schedules

This section displays reports that have been executed as part of scheduled tasks in the Reports Module. These are reports that were automatically generated based on predefined schedules rather than manual execution.

To access Executed Schedules: 1. Click the icon in the left-side navigation menu of the Web Interface 2. The system will open the Executed Schedules page shown below:

For any of the executed reports schedules that are listed here, you can download or delete them.

  • Download - Click the report's filename to initiate a ZIP archive download. Extract the archive to access the report in CSV format.
  • Delete - Click the delete icon in the actions menu for the report. A confirmation dialog will appear to prevent accidental deletion:

For detailed instructions on creating scheduled reports, refer to the Scheduling Reports section in the Reports Module documentation.